About Me

In 1999, I graduated my bachelor degree in civil engineering with cum laude degree. Then, I joined various contractor company built residential, office and also infrastructure building. I also have experience in engineering design while I joined in consultant company for water infrastructures engineering. In the end 2003 I started my career in oil and gas industry as marine Field Engineer. I involved in many offshore installation projects. Many courses and training related to offshore industry I did to support my work.

Contact Details

Ignatius Agus Raharjo
Tangerang Selatan
15417 Indonesia

(062)8195424068/span>
agusr150@yahoo.co.id



Education

Institut Teknologi Bandung

Bachelor Degree in Civil Engineering 1999 - 2003

Four years program of civil engineering which taught several subjects such as Geotechnical Engineering, Transportation Engineering, Construction Project Management, Structural Engineering, and Water Resources Engineering.
Final project title: Detai Design and Study of Water Supply for Cattle Demand in Cipamatuh Area, West java, Indonesia.

Institut Teknologi Bandung

Master Degree in Ocean Engineering 2011 - 2013

Two years program of master degree focus on study of offshore and coastal behaviour for the constructions. Several subjects were taught during this program such as Hydrodynamics, Offshore Geotechnic, Corrosion, Random Wave, etc.
Final Project title : Optimization Bow String for Pipelay Initiation Method

Politecnico di Torino

Master Specialization in Navigation and Related Applications 2011 - 2013

One year program of master specialization was conducted by Politecnico di Torino and supported by Compagnia di San Paolo for my scholarship. The program was taught in English and has many subjects related to GNSS (Global Navigation Satellite System) such as GPS and GALILEO receivers, frontend antenna, geomatics, communication system, timing, etc. .
At the end of this program, internship was mandatory and I joined in ITHACA (Information Technology for Humanitarian Assistance, Cooperation and Action)



Works

PT Cellio Mitra Graha, Jakarta, Indonesia

Supervisor 2003 -2004

Supervise project activities, material procurement, and sub-contractor coordination.
Project involved : Residential and Office Buildings

PT Jaya Konstruksi Manggala Pratama, Jakarta, Indonesia

Site Engineer 2004 -2005

Join in survey team for land survey, monitoring and doing coordination activities and progress to meet with quality plan, produce progress report.
Project involved :
Kerang- Segendang-Tj.Aru Roda Building, East Kalimantan,
Busway project, Jakarta

PT Sapta Adhi Pratama, Bandung, Indonesia

Design Engineer 2005

- Collecting data for as requreid for design, site visit, review survey data
- Analysis data and perform initial design
- Produce preliminary, pre-final, and final report
- Assist team leader for project presentation.
Project involved :
Detail Design of Sindang Pano Dam, Majalengka, West Java

PT McDermott Indonesia

Marine Field Engineer 2005-2008

Preparation project prior to installation such as equipments, materials, installation aids, load out, etc.
During the offshore installation: onboard the vessel and coordination every party for the installation and pre-commissioning.

Project involved :
Block PM-3 Commercial Arrangement Area (CAA) Bunga Tulip A Development project, between Malaysia and Vietnam offshore in the Gulf of Thailand
PM3- Camau Gas Pipeline, Vietnam
Substructure and Pipelay, Woodside Energy Ltd., Western Australia
EPCI Offshore Gas Pipeline Su Tu Vang/ Su Tu Den – Rang Dong Project, Vietnam

Saipem Sharjah Engineering

Offshore Methods Engineer 2009-2010

Preparation project prior to installation such as equipments, materials, installation aids, load out, etc.

Project involved :
Long Term Agreement, Saudi Aramco, Safaniya - Zuluf Pipeline Installation

Sigur Ros Indonesia

Senior Field Engineer 20012-2014

Preparation project prior to installation such as equipments, materials, installation aids, load out, etc.
During the offshore installation: onboard the vessel and coordination every party for the installation and pre-commissioning.

Project involved :
Pipeline Replacement Project 2012 - PHE ONWJ
Tender of Pipeline Installation 2014-2016 - Petronas Carigali
Transportation and Installation of Offshore Facilities for Diyarbekir Development Project - Petronas Carigali Turkmenistan
Pipeline Replacement Project 2013 - PHE ONWJ

Bumi Armada Bhd

Senior Offshore Installation Engineer 20014-2015

Preparation project prior to installation such as equipments, materials, installation aids, load out, etc.

Project involved :
Development Project Filanovsky – Korchagin Field - Lukoil

ENI Indonesia

Fabrication and Installation Rigid Pipeline Engineer 20015-2016

As Company representative during fabrication and installation of all rigid lines in the project. Review the engineering and installation procedure documents from Contractor / Subcontractor related to the pipeline activities.

Project involved :
Jangkrik Complex Project

Caspian Service Contractor

Field Engineer 20018-2018

As field engineer to assist project engineer for offshore installation.

Project involved :
Filanovsky Development - LUKOIL

Saipem Sharjah Engineering

Offshore Methods Engineer 2018-2018

As project engineering for subsea installation to prepare all materials, equipment, schedule for offshore installation and involve in the offshore campaign.

Project involved :
LTA Saudi Aramco - Manifa Field

KALYON İNŞAAT SAN. TİC. A.Ş

Project / Field Engineer 2020

As project engineering for subsea installation to prepare all materials, equipment, and procedure for offshore installation and involve in the offshore campaign.

Project involved :
TRNC Pipeline Repair